A curriculum of short Decision Labs on Summit Grid, each built around one operating judgment call — the problems that don't happen often enough to train on when they finally do.

50+ scenarios planned across eight operational domains, three difficulty levels, and six competency areas. One is playable today; the rest are in development or on the roadmap.

50+
Scenarios planned
8
Operational domains
3
Difficulty levels
6
Competency areas

Browse

The full curriculum.

Domain
Level

64 scenarios

  • DL-001Available

    The Easy Tie

    Restoration & Switching · Operational

    A feeder locks out. The closest tie is available — but available is not the same as suitable.

    • System awareness
    • Electrical awareness
    • Information awareness
    Try lab
  • DL-002Planned

    The Backfeed Question

    Restoration & Switching · Operational

    A customer generator backfeeds the line through an optional interlock. Assume energized until proven dead.

    • System awareness
    • Electrical awareness
    Planned
  • DL-003Planned

    One More Section

    Restoration & Switching · Foundational

    Pick up customers section by section without over-reaching the source.

    • System awareness
    • Operational judgment
    Planned
  • DL-004In development

    Restore Now or Verify First

    Restoration & Switching · Operational

    Customers are out and a quick close is tempting — before the field confirms.

    • Operational judgment
    • Information awareness
    • Execution discipline
    In development
  • DL-005Planned

    The Alternate Path

    Restoration & Switching · Operational

    Two ties can restore the load. The path, not the tie, decides it.

    • Electrical awareness
    • Operational judgment
    Planned
  • DL-006In development

    Normal Is Not Restored

    Restoration & Switching · Operational

    Customers are back on, but the system is still in an abnormal configuration.

    • System awareness
    • Operational judgment
    In development
  • DL-007Planned

    Parallel for a Moment

    Restoration & Switching · Advanced

    Closing a normally-open tie parallels two feeders. You saw a tie; the grid saw a parallel.

    • Electrical awareness
    • Execution discipline
    Planned
  • DL-008Planned

    The Last Customer Block

    Restoration & Switching · Foundational

    The final isolated block can only come back after a repair. Sequence the rest.

    • System awareness
    • Operational judgment
    Planned
  • DL-009Planned

    Return to Normal

    Restoration & Switching · Operational

    The repair is done. Restore the normal configuration without a second interruption.

    • System awareness
    • Execution discipline
    Planned
  • DL-010Planned

    The Unexpected Bottleneck

    Restoration & Switching · Advanced

    The obvious restoration overloads a segment no one was watching.

    • Electrical awareness
    • System awareness
    • Operational judgment
    Planned
  • DL-011Planned

    Frozen in Time

    SCADA & Telecommunications · Operational

    An analog hasn't moved in an hour. Is the system steady, or is the point stale?

    • Information awareness
    • System awareness
    Planned
  • DL-012Planned

    Control Failed

    SCADA & Telecommunications · Operational

    A remote open didn't take. Decide the next move with the device state uncertain.

    • Information awareness
    • Execution discipline
    Planned
  • DL-013Planned

    The Quiet RTU

    SCADA & Telecommunications · Foundational

    An RTU drops off. What can you still trust downstream of it?

    • Information awareness
    • System awareness
    Planned
  • DL-014In development

    Closed on the Screen

    SCADA & Telecommunications · Operational

    SCADA says the switch is open; the field says closed. Status is not the same as state.

    • Information awareness
    • System awareness
    • Operational judgment
    In development
  • DL-015Planned

    Partial Visibility

    SCADA & Telecommunications · Operational

    Half the feeder's points are reporting. Act, or wait for the rest?

    • Information awareness
    • Operational judgment
    Planned
  • DL-016Planned

    The Missing Analog

    SCADA & Telecommunications · Foundational

    The loading value you need isn't there. Infer it, or get it another way.

    • Information awareness
    • Electrical awareness
    Planned
  • DL-017Planned

    Communications Lost

    SCADA & Telecommunications · Advanced

    A regional comms outage removes both visibility and control at once.

    • Information awareness
    • System awareness
    • Workload & prioritization
    Planned
  • DL-018Planned

    Status Without Control

    SCADA & Telecommunications · Operational

    You can see the device but can't operate it remotely. Plan around it.

    • Information awareness
    • Execution discipline
    Planned
  • DL-019Planned

    “It's Open”

    Field Communication & Coordination · Foundational

    A one-word report. Open where, and confirmed how?

    • Information awareness
    • Execution discipline
    Planned
  • DL-020Planned

    Wrong Device, Right Number

    Field Communication & Coordination · Operational

    The device number matches — on a different feeder.

    • Execution discipline
    • System awareness
    Planned
  • DL-021Planned

    Patrol Complete

    Field Communication & Coordination · Foundational

    “Patrol complete, nothing found” — on a line that still won't hold.

    • Information awareness
    • Operational judgment
    Planned
  • DL-022Planned

    Radio Cutout

    Field Communication & Coordination · Operational

    A switching instruction is half-heard. Confirm before anyone acts.

    • Execution discipline
    • Information awareness
    Planned
  • DL-023Planned

    Conflicting Reports

    Field Communication & Coordination · Operational

    Two crews describe the same device two different ways.

    • Information awareness
    • Operational judgment
    Planned
  • DL-024Planned

    The Crew Handoff

    Field Communication & Coordination · Operational

    A new crew takes over mid-event. What did the last crew actually leave open?

    • Execution discipline
    • System awareness
    Planned
  • DL-025Planned

    Which Switch?

    Field Communication & Coordination · Foundational

    Two switches share a pole and nearly share a name.

    • Execution discipline
    • Information awareness
    Planned
  • DL-026Planned

    Confirm Before Acting

    Field Communication & Coordination · Operational

    The plan is sound; the device state it rests on is unconfirmed.

    • Execution discipline
    • Operational judgment
    Planned
  • DL-027Planned

    First Alarm Isn't the Cause

    Alarm Management & Situational Awareness · Operational

    The first alarm to land is rarely the first thing that happened.

    • System awareness
    • Operational judgment
    Planned
  • DL-028Planned

    47 Alarms

    Alarm Management & Situational Awareness · Advanced

    An alarm storm hits — hundreds active. Find the one that actually matters.

    • Workload & prioritization
    • System awareness
    Planned
  • DL-029Planned

    One Alarm in the Noise

    Alarm Management & Situational Awareness · Operational

    A single critical alarm is buried among nuisance alarms.

    • Workload & prioritization
    • System awareness
    Planned
  • DL-030Planned

    Clear Doesn't Mean Normal

    Alarm Management & Situational Awareness · Foundational

    The alarms cleared. The system is still not in a normal state.

    • System awareness
    • Operational judgment
    Planned
  • DL-031Planned

    Two Feeders, One Minute

    Alarm Management & Situational Awareness · Advanced

    Two feeder events arrive almost together. Which gets attention first?

    • Workload & prioritization
    • Operational judgment
    Planned
  • DL-032Planned

    The Repeating Alarm

    Alarm Management & Situational Awareness · Operational

    The same alarm keeps re-arming. Signal, or distraction?

    • System awareness
    • Workload & prioritization
    Planned
  • DL-033Planned

    Event Before Alarm

    Alarm Management & Situational Awareness · Operational

    A customer call precedes the telemetry. Trust it yet?

    • Information awareness
    • Operational judgment
    Planned
  • DL-034Planned

    What Changed First?

    Alarm Management & Situational Awareness · Advanced

    Reconstruct the sequence to find the root, not the symptom.

    • System awareness
    • Information awareness
    Planned
  • DL-035Planned

    Ninety-Four Percent

    Loading & System Configuration · Operational

    A transfer lands a feeder at 94% of rating. Acceptable, or too close?

    • Electrical awareness
    • Operational judgment
    Planned
  • DL-036Planned

    The Hidden Bottleneck

    Loading & System Configuration · Operational

    The breaker has room; a mid-line segment does not.

    • Electrical awareness
    • System awareness
    Planned
  • DL-037Planned

    After the Transfer

    Loading & System Configuration · Operational

    Load rises after a transfer that was fine at the time.

    • Electrical awareness
    • Operational judgment
    Planned
  • DL-038Planned

    Load Keeps Rising

    Loading & System Configuration · Operational

    The evening climb pushes an abnormal configuration toward its limit.

    • Electrical awareness
    • Workload & prioritization
    Planned
  • DL-039Planned

    Alternate Source Limit

    Loading & System Configuration · Operational

    The alternate source can reach the load but not carry all of it.

    • Electrical awareness
    • Operational judgment
    Planned
  • DL-040Planned

    The Regulator Problem

    Loading & System Configuration · Advanced

    A transfer changes what a voltage regulator is being asked to do.

    • Electrical awareness
    • System awareness
    Planned
  • DL-041Planned

    The Evening Peak

    Loading & System Configuration · Foundational

    A move that works at 2 a.m. may not work at 6 p.m.

    • Electrical awareness
    • Operational judgment
    Planned
  • DL-042In development

    Restored Isn't Normal

    Loading & System Configuration · Operational

    Hours after a transfer, the temporary configuration is carrying more than planned.

    • Electrical awareness
    • System awareness
    • Operational judgment
    In development
  • DL-043Planned

    Locked Out Again

    Protection & Abnormal Conditions · Operational

    A feeder locks out a second time after a successful close.

    • System awareness
    • Electrical awareness
    Planned
  • DL-044Planned

    The Relay Target

    Protection & Abnormal Conditions · Operational

    A relay target narrows — or misleads — the search for the fault.

    • System awareness
    • Information awareness
    Planned
  • DL-045Planned

    Ground or Sensitive Ground

    Protection & Abnormal Conditions · Advanced

    The protection indication points to a particular kind of fault.

    • Electrical awareness
    • System awareness
    Planned
  • DL-046Planned

    The Recloser That Didn't

    Protection & Abnormal Conditions · Operational

    A recloser should have cycled. It didn't. What does that tell you?

    • System awareness
    • Operational judgment
    Planned
  • DL-047Planned

    Second Trip

    Protection & Abnormal Conditions · Operational

    The second trip changes the restoration plan.

    • System awareness
    • Operational judgment
    Planned
  • DL-048Planned

    Protection Changed the Plan

    Protection & Abnormal Conditions · Advanced

    A protection detail makes the obvious restoration the wrong one.

    • Electrical awareness
    • Operational judgment
    Planned
  • DL-049Planned

    Fuse or Feeder?

    Protection & Abnormal Conditions · Foundational

    Is this a fused-lateral event or a feeder event? It drives everything.

    • System awareness
    • Operational judgment
    Planned
  • DL-050Planned

    Unexpected Operation

    Protection & Abnormal Conditions · Operational

    A device operated that no one expected to operate.

    • System awareness
    • Information awareness
    Planned
  • DL-051In development

    Two Calls at Once

    Concurrent Events & Workload · Operational

    A second lockout lands while you're mid-restoration on the first.

    • Workload & prioritization
    • Operational judgment
    In development
  • DL-052Planned

    Planned Work Meets an Outage

    Concurrent Events & Workload · Operational

    A clearance is in progress when an unrelated outage hits.

    • Workload & prioritization
    • Execution discipline
    Planned
  • DL-053Planned

    Three Crews Waiting

    Concurrent Events & Workload · Operational

    Three crews want actions at once. Order them well.

    • Workload & prioritization
    • Execution discipline
    Planned
  • DL-054Planned

    Shift Change

    Concurrent Events & Workload · Foundational

    Hand off an active event without losing state.

    • Workload & prioritization
    • Execution discipline
    Planned
  • DL-055Planned

    The Second Event

    Concurrent Events & Workload · Advanced

    A second event mid-inspection splits your attention.

    • Workload & prioritization
    • System awareness
    Planned
  • DL-056Planned

    One Desk, Too Much Information

    Concurrent Events & Workload · Advanced

    Everything is arriving at once. Triage before you act.

    • Workload & prioritization
    • Operational judgment
    Planned
  • DL-057In development

    The Case for Waiting

    Information Quality & Operational Judgment · Operational

    Every option restores customers. One piece of information hasn't come back yet.

    • Operational judgment
    • Information awareness
    In development
  • DL-058Planned

    Known, Indicated, Reported

    Information Quality & Operational Judgment · Foundational

    Sort what you know from what you've only been told.

    • Information awareness
    • System awareness
    Planned
  • DL-059Planned

    What Do We Actually Know?

    Information Quality & Operational Judgment · Operational

    Separate established fact from inference before you act.

    • Information awareness
    • Operational judgment
    Planned
  • DL-060Planned

    The Missing Confirmation

    Information Quality & Operational Judgment · Operational

    The plan rests on a confirmation that never came.

    • Information awareness
    • Execution discipline
    Planned
  • DL-061Planned

    Confidence Isn't Certainty

    Information Quality & Operational Judgment · Operational

    A confident report is still a report, not a confirmation.

    • Information awareness
    • Operational judgment
    Planned
  • DL-062Planned

    When Not to Operate

    Information Quality & Operational Judgment · Advanced

    The strongest move on the board is to hold.

    • Operational judgment
    • System awareness
    Planned
  • DL-063Planned

    Assumed Open

    Information Quality & Operational Judgment · Operational

    A device treated as open was never confirmed open.

    • Information awareness
    • Execution discipline
    Planned
  • DL-064Planned

    Escalate or Continue

    Information Quality & Operational Judgment · Operational

    Handle it at the desk, or escalate now?

    • Operational judgment
    • Workload & prioritization
    Planned

The information model

Every piece of information says where it came from.

Decision Labs label information by its source. The labels aren't a ranking of trust — they make it easier to notice what a decision is resting on.

KNOWN
Established by record or direct confirmation
INDICATED
What the control system shows
REPORTED
Someone told you
INFERRED
Worked out from other information
ASSUMED
Taken as true without checking

GridOps Field Test

Get told when the next lab is ready.

We release Decision Labs as they're built. Leave an email to hear when the next one is playable. You never need an address to play.

One email per new scenario. No account needed to play.

Summit Grid is a fictional training environment. GridOps Labs provides educational training content and does not replace employer operating procedures, qualification requirements, safety rules, or authorization to operate electrical systems.